Skip to Content

Blog Archives

GATA Construction Works of the New Building of the Department of Cardiology

Details of the Project

There are angio hall, post angio healing, coroner intensive care units, outpatient clinic areas and patient bed rooms in an area of 6.500 m2. Heating, air conditioning, light automation is attained throughout the hospital. There is the nurse call system, data network installations, fire sensing system telemetry system, TV system general announcement system in the hospital.

READ MORE

GATA Construction Works of Heart Vein New Building

Details of the Project

Project has a closed area of 15.000 m2 contains clinic buildings at GATA Heart Vein Surgery Hospital. Connection of mechanical installation operation automation system is made. There are kitchen and laundry facilities in the hospital in general and the intensive care units, bedside units of patient beds, multi function patient beds, and flow based operation halls, advanced technology used sterilization center, all materials of bed rooms are supplied in polluted-clean traffic flow reaching to floors through single charges. There is computer controlled water softening system present. There are the nurse call system, data network installation, fire sensing system, telemetry system, conference hall in the scope of conference hall for 140 persons, voice system, simultaneous translation system in the scope of electricity installation works of he hospital in addition to air conditioning automation, lift installation, new built sub-station generator building containing 4 each 1100 KVA generator that starts operation according to requirements. The entire environment arrangement, infrastructure, connection road works in the scope of the Project as a total area of 15.000 m2 and the planting works are completed.

READ MORE

Ankara GATA Construction Works of Arrangements in the VIP Intelligence and Treatment Rooms

Details of the Project

In the 2.000 m2 of closed area the, upper most floor of the existing hospital building is arranged with the purpose of providing service to the President of the Republic, Chiefs of General Staff and Upper Level Managers, by using the extremely advanced construction Technologies.

READ MORE

City of Konya, Çumra Sub-Town Construction Works of State Hospital

Details of the Project

City of Konya, Çumra Sub-Town Construction Works of Infrastructure And Environmental Arrangements of 50 Beds Capacity State Hospital
In the 50 beds capacity hospital building here are the operation halls, meting halls, dining hall and auxiliary service units.

READ MORE

Şırnak – Cizre Construction Works of 150 Beds Capacity State Hospital

Details of the Project

Cizre 150 Beds Capacity State Hospital construction works contains operation halls, laboratories, x-ray rooms, hemo dialysis locations, out patent buildings in a closed area of 32.500 m2 and is currently the largest hospital of the region fully equipped.

READ MORE

Istanbul GATA, Construction Works of the Haydarpaşa Hospital, Sea and Under Water Medicine Building

Details of the Project

The Istanbul GATA , Haydarpaşa Hospital Sea and Underwater Medicine Construction Project having a closed area of 3.500 m2 was commenced in year 1995 and completed in year 1996. The Underwater Medicine Hospital was built in Turkey for the first time and this is the only hospital present. Within the structure of the Sea and Underwater Medicine Department there are pressure rooms present for single person.

READ MORE