Project Details
Marmara University Recep Tayyip Erdoğan Social Complex Engineering And Technology Faculties Construction Work
Marmara University Recep Tayyip Erdoğan Social Complex Engineering And Technology Faculties Construction Work
Construction of Buildings, infrastructure and environment arrangement works of the project having construction area of 91.000 m2. There are 3 each dining blocks, 2 each training block and 1 each dining hall and administrative block in the Project. It contains 1 each health center, conference hall with capacity for 1.000 persons and closed sporting hall, closed and semi open gun-shooting hall, main building gate, soccer filed with turbines, pentathlon and sporting hall buildings.
There are blocks built for the Faculty of Sciences and Literature in the scope of the Project, containing large classrooms, classrooms and laboratories. In the scope of the new Project, energy main building supplying service to the entire campus, the heat galleries and root central building for transfer of electricity to the entire campus are built. Total closed area of the Project is 40.000 m2. The entire infrastructure, connection road of facilities contained in the scope of the project has a total area of 96.000 m2 and environmental arrangement and planting works are performed.
There is the library building, study rooms, reading rooms, canteen, dining hall sections built and completed in the scope of the project. Reading tables, book cabinets, reading cabins, study desks, kitchen and dining hall sections together with all kinds of fixtures are completed. Total closed area is 9.780 m2.
In the Engineering Faculty buildings there are, the laboratories, class rooms, large classrooms, conference hall, and rooms for teaching staff, canteen and multi purpose halls present, for each department of engineering. Total closed area is 44.000 m2. In the scope of project having total area of 68.000 m2 all infrastructure, connection roads are built along with performance of environmental arrangement and planting works.
Clinical building of Faculty of Veterinary Sciences contains 4 blocks. Total closed area is 16.000 m2 and blocks contain operation rooms, clinics, post-hospitalization areas, rooms for teaching staff and closed car park.
Kırıkkale University, Faculty of Medicine, Department of Morphology project contains classrooms, large classrooms, laboratories, conference hall, Office of the dean and Office of chief surgeon.
Konya-Yunak Construction Works Of Primary School With 16 Class Rooms, Boarding House And Multi Purpose Hall Buildings And The High School Building With 24 Classrooms At Şanlıurfa Suruç.
There is the school complex formed by 1 each Primary School containing 16 classrooms, boarding house building with 200 students capacity, 1 each multi purpose hall constructed in the scope of the project, at Konya Yunak sub-town; 1 each High school building with 24 classrooms with all of its infrastructure, environmental and field works completed in the city of Şanlıurfa, at Suruç sub-town. This Project has 16.500 m2 Closed area and is completed with all of its infrastructure, environmental arrangement and planting area, together with surrounding safety walls and open sporting fields.
Giresun University (Giresun Üniversitesi) Construction Works Of The Faculty Of Sciences And Literature, 1st Section; The Buildings Of Faculty Of Economic And Administrative Sciences And Of The Faculty Of Sciences Along With Infrastructure And Environmenta.
Total closed area is 55.000 m2. There are the construction works of the Faculty of Sciences, having a closed area of 10.800 m2 ; construction works of the 1st Section of the Faculty of Sciences and Literature and the Faculty of administrative Sciences Building (İ.İ.B.F ) having a closed area of 44.200 m2 in the scope of the project. The infrastructure and environment arrangement works of these buildings are completed and present. In the scope of the project, there are total of 20 each large classroom, 88 each classrooms, 14 each computer laboratory, 6 each language laboratory and 4 each student laboratory.
There are swimming pool, closed hall in which international competitions at Olympic dimensions can be made, 2 each training hall, sportsmen recreation hall, undressing and condition halls, open sporting areas, running ways, and administration building in the scope of the project.
PEKERLER CONSTRUCTION which was established in 1986 and is one of the most experienced companies of its sector has succeeded a lot of infrastructure and superstructure projects since its establishment.
Details…
Pekerler İnşaat Enerji Taşımacılık Turizm San. Ve Tic. Ltd. Şti.
Address : İlkbahar Mahallesi 596.Sokak No:71 Çankaya/ANKARA
Phone : + 90 312 491 38 38
Fax : + 90 312 491 47 47